A Queensland induction should give workers information, training and instruction that is suitable and adequate for their work, the risks at the time and the controls in place, and easy to understand. WorkSafe's topics are worker responsibilities, hazards and how to control them, safe work procedures and equipment use, emergency procedures and where to find the first aid kit. Use a checklist, have each worker show they understand and keep the completed list on file. The checklist alone does not make you compliant.[2][1]
What the law asks for
Section 39 of the Work Health and Safety Regulation 2011 requires information, training and instruction to be suitable and adequate, having regard to the nature of the work, the risks at the time it is given and the control measures in place. So far as reasonably practicable, it must be provided in a way the person can readily understand.
WorkSafe says new workers must be trained before they start work, to become familiar with their tasks, their place of work and the people around them, and each should demonstrate they understand.
For a construction project, sections 309 and 310 also require the principal contractor to prepare a written WHS management plan before work starts and, so far as reasonably practicable, make each person doing construction work aware of its contents and their right to inspect it before they begin. Build that briefing into the site induction where these project duties apply.
Checklist, with the source of each item
Items marked WorkSafe come from its induction topics. Items marked ours are additions for multi-trade sites.
| Item | Cover | Basis |
|---|---|---|
| Responsibilities | Workers' health and safety responsibilities | WorkSafe |
| Hazards and controls | Hazards and risks in the workplace and how they are controlled | WorkSafe |
| Safe work and equipment | Safe work procedures and how to use equipment safely | WorkSafe |
| Emergencies | How to evacuate, assembly points, exits and fire wardens | WorkSafe |
| First aid and contacts | First aid kit location and contacts for the first aid officer, HSR, return to work coordinator and EAP | WorkSafe |
| Safe access and other trades | Where to enter, walk and park, and what other trades are doing nearby | Ours |
| SWMS where applicable | Which SWMS applies, where it is kept and that the worker has read it | Ours |
| Site rules and sign-off | Site rules, then worker signature, date and inductor | Ours |
Sources[1]
Keep the record and repeat when needed
WorkSafe suggests using a checklist and keeping it on file as a record of training, and has a downloadable induction checklist. It says workers returning after a long absence should repeat the induction. The law requires training records for some tasks, such as confined spaces and certain hazardous chemicals, and WorkSafe calls it good practice to keep records of all training including induction.
Sources[1]
An induction is not task training or a licence
Workers also need supervised, hands-on training in the tasks they will do, and some tasks need offsite training and a high risk work licence. General construction training such as the white card is a separate topic.
Sources[1]
Site induction record you can copy
This record is our example, not a WorkSafe form. Replace every square bracket.
SITE INDUCTION RECORD Site: [address] Date: [DD/MM/YYYY] Worker: [name] Employer: [business] Inducted by: [name] Covered (tick when done): [ ] Worker responsibilities [ ] Hazards and risks on this site and their controls: [list] [ ] Safe work procedures and equipment: [list] [ ] Safe access, parking and other trades: [notes] [ ] SWMS for this worker's tasks, where applicable: [titles, where kept] [ ] Emergency procedures, assembly point, exits: [location] [ ] First aid kit location and contacts: [names] [ ] Site rules: [list] Worker showed understanding by: [question, demonstration] Worker signature: [signature] Date: [DD/MM/YYYY] Inductor signature: [signature] Date: [DD/MM/YYYY]
Common questions
- What should be included in an induction checklist?
- WorkSafe lists worker responsibilities, hazards and risks and how to control them, safe work procedures and equipment use, emergency procedures, and where to find the first aid kit, plus contact details for people with safety responsibilities. Add site-specific items such as access and other trades.[1]
- What is an induction checklist?
- It is a list used to cover and record the topics a new worker is told about before starting. WorkSafe suggests using one and keeping it on file as a record of training. The checklist records the induction but does not by itself show the induction was suitable and adequate.[1][2]
Official sources
Checked 16 October 2026. Rules can change; use these sources to check the requirements for your job.
Related guides
- SWMS requirements in Queensland: when you need one
- Who on my Queensland trade crew needs a white card?
- What first aid arrangements must a Queensland trade employer provide?
Job workflows for builders.
Put it to work on the next job
Use Leadhand's site checklists and sign-off forms to keep the induction record with the job.
See Leadhand site checklists and forms